Real projects

Balcony waterproofing

Balcony waterproofing
Location
Cluj-Napoca
Area
24 m²
Duration
2 days
Year
2025
System applied
Reinforced polyurethane liquid membrane

The challenge

A 24 m² balcony with lifting tiles and leaks into the ceiling of the flat below. The complicated geometry — three internal corners, a column and a balustrade fixed into the slab — made clean cutting of a roll membrane impossible.

The solution

We removed the finish, repaired the substrate and applied a two-coat polyurethane liquid system with a reinforcing fleece between the coats. The system was dressed 15 cm up the walls and around every balustrade fixing.

The result

Completed in two days, with no scaffolding and no work inside the flat below.

Back to projects
Have a project in mind?

Let's talk!

Send us the details and we will provide free consulting for installation, design or choosing the right materials.